TB 9-4940-319-30
3.
Location of Equipment - Continued
Table 4. Components to be Mounted, ISO-2-1 - Continued
Figure
NSN
Qty
Description
No.
1
SEPARATOR, OIL AND WATER
1
TABLE, WELDING
1
TABLE, WORK, AUTOMOTIVE MAINTENANCE
1
TOOL KIT, BODY AND FENDER REPAIR
1
TORCH OUTFIT, CUTTING AND WELDING
1
TORCH OUTFIT, METALLIZING AND WELDING
1
TRUCK, HAND, TWO-WHEELED
5120-00-293-1439
1
VISE, MACHINIST'S (4.00 IN.)
3431-00-903-5647
1
WELDING MACHINE, ARC
1
WELDING SET, ARC, INERT GAS SHIELDED
Section II. INSTALLATION IN 280 SHELTER
4.
Installation
a. Follow steps (1) thru (3) below for
NOTE
installation of blind rivet nuts and strap loops in the 280
shelter, unit 1.
Hand blind riveter (5120-00-679-6523)
is used to install blind rivet nuts in
(1) Mark and drill twenty-seven 0.25-in.
floor and walls of 280 shelter. Install
diameter holes in floor and walls in accordance with
blind rivet nuts in accordance with
figures 3 and 4. Install twenty-seven #10 blind rivet nuts
the manual supplied with the hand
(S37B80). Secure twelve strap loops (MS51939-3) to
blind riveter. Position floor- and work
walls and floor, using twenty-four #10 x 1/2-in.
table top-mounted equipment as
countersunk head machine screws (MS35190-271).
equipment mounting holes as a
(2) Mark and drill six 0.41-in. diameter
template for location of blind rivet
holes in the rear right floor in accordance with figure 3.
nuts and fasteners in accordance
Install six 5/16-in. blind rivet nuts (MS27130-S45K).
may be varied to drill into structural
members in floor.
8