0005 00
TM 1-4920-436-13&P
POSITIONING ROOF AND HINGED END WALLS CONTINUED
Figure 12.
Raising Hinged Roof.
NOTE
Two personnel outside shelter must lift roof panel far enough to allow two people inside to
perform following steps:
2.
Lift roof panel (Figure 12, Item 1).
3.
Release two support strut assemblies (Figure 12, Item 3) from roof panel and extend them to full length.
4.
Insert pin (Figure 12, Item 2).
0005 00-12