TM 5-3610-256-14
Table 4-2. Direct Support
2
Interval
W
M
Preventive Maintenance Checks and Services (Continued)
W - Weekly
M - Monthly
Item to be Inspected
Procedure
CLEAN DEVELOPER ROLLER (CONTINUED)
7. Wipe roller (6) with cloth as roller rotates.
Continue until roller is clean or machine
stops. If roller is not thoroughly clean,
depress Fwd switch again and continue
wiping until roller is thoroughly clean.
8. Rinse cloth in fresh clean water.
9. Replace developer pick-off with front lip
resting on studs (7).
10. Power OFF.
11. Unplug power cord.
SUPPLY CASE AND CARRYING CASE
1.
Inspect supply case and carrying case for
damage.
4 - 6
Change 1