• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Chapter 5. OPERATING INSTRUCTIONS [SECOND ECHELON)
Figure 28. Opening folding shop sides, step I.

TM-55-4920-213-15 Shop Set Aircraft Maintenance Semitrailer Mounted Set C-4 Sheet Metal Manual
Page Navigation
  25    26    27    28    29  30  31    32    33    34    35  
TM 55-4920-213-15
Section Ill. OPERATION UNDER USUAL CONDITIONS
71. General
Instructions in this section are published for
the use of second echelon maintenance person-
nel responsible for the operation of this equip
ment. It is essential that the operator know
how to perform every operation of which the
equipment is capable.
72. Preparation for Use of Equipment
a. Exterior.
(1) Install ground stake, located in com-
partment below rear doors, by fasten-
ing cable to bolt provided with wing
nut, on left rear skid and drive stake
Figure 26. Installation and adjustmen t of stablizing
into ground (fig. 25).
jacks; positioning front ladder.
Figure 25. Installation of ground stake.
(2) Position chocks.
(3) Install the stabilizing jacks (fig. 26),
and adjust them as necessary.
(4) Remove entrance ladders from rear
doors and front storage compartment
and position as shown in figure 27.
(5) Open right rear door (fig. 27 and TM
9-2330-238-14) .
b. Opening of Shop. AU folding shop sides
open from inside the shop (fig. 28 and TM 9-
2330-238-14) .
(1) Release over-center clamps front and
rear at top of each door.
(2) Release locks on center post, two on
each side (fig. 29 and TM 9-2330-
Figure 27. Positioning rear entrance ladders and
238-14).
opening  rear  doors.
34






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.