• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 28. Opening folding shop sides, step I.
Section IV. OPERATION OF ONE UNIT IN CONJUNCTION WITH ANOTHER ACCESSARY OR AUXILIARY

TM-55-4920-213-15 Shop Set Aircraft Maintenance Semitrailer Mounted Set C-4 Sheet Metal Manual
Page Navigation
  27    28    29    30    31  32  33    34    35    36    37  
TM 55-4920-213-15
Figure 30. Opening folding shop sides, step III.
c. Pneumatic System-compressor Operated.
(1) Inspect lines, connectors, and fittings,
for security and condition..
(2) Check operation of air compressor;
refer to the TM for the compressor
(app. I), for procedure and details
of operation.
(3) With compressor running, inspect
lines, connectors, fittings, controls,
and instruments for leaks, security,
and proper operation.
d. Pneumatic System-Auxiliary Power
Operated.
(1) Inspect lines, fittings, and connectors
for leaks and security.
(2) Install line from auxiliary to air sup-
ply tank (fig. 13).
Figure 31. Chain guard railing installation.
36






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.