TM 9-4933-223-13&P
19 SERVICE LOOP (47) IN "T" CONDUIT BOX J21 (32).
a.
Cut in center.
b.
Strip insulation (48) back 0.5 in. (1.27 cm) from
ends on
cut wires.
c.
Install two lug terminals (49) on green wire no. 11
(51) and green wire no. 11 (52).
20 GREEN WIRE NO.
11 (52) IN
SWITCH-BOX S9-(30). Install lug
terminal (49).
3-71