POSITIONING SHELF CABINET (E) FOR OPERATIONAL MODE
POSITIONING 4 DRAWER CABINET (F) FOR OPERATIONAL MODE

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  63    64    65    66    67  68  69    70    71    72    73  
img
. . .
0014 00
TM 1-4920-438-13&P
- CONTINUED
2.
Store four bolts (Figure 1, Item 2), four lock washers (Figure 1, Item 3), and four lat washers (Figure 1, Item
4) in secure storage location.
3.
Position Cabinet (E) (Figure 1, Item 1) at operational mode location.
4.
Remove four setscrews (WP 0072 00, Figure 2, Item 18 or 19) from shelter BII box (WP 0002 00, Figure 2,
Item 8 or WP 0002 00, Figure 3, Item 8) and install into empty loor inserts.
END OF WORK PACKAGE