• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POSITIONING SHELF CABINET (E) FOR TRANSPORT MODE
POSITIONING EYEWASH STATION ASSEMBLY BRACKET AND HARDWARE FOR TRANSPORT MODE

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  92    93    94    95    96  97  98    99    100    101    102  
img
. .
0026 00
TM 1-4920-438-13&P
POSITIONING SHELF CABINET (E) FOR TRANSPORT MODE - CONTINUED
1.
Remove four setscrews from shelf cabinet (E) (Figure 1, Item 1) transport location loor inserts and store
shelter BII box (WP 0002 00, Figure 2, Item 8 or WP 0002 00, Figure 3, Item 8).
2.
Remove four bolts (Figure 1, Item 2), four lock washers (Figure 1, Item 3), and four lat washers (Figure 1,
Item 4) from storage location.
3.
Position shelf cabinet (E) (Figure 1, Item 1) at transport location.
4.
Align two cabinet brackets (Figure 1, Item 5) with loor inserts at shelf cabinet (E) transport location.
5.
Inspect four bolts (Figure 1, Item 2) for thread damage or rounded heads.
6.
Replace bolts (Figure 1, Item 2) if damage is detected.
7.
Install four bolts (Figure 1, Item 2), four lock washers (Figure 1, Item 3), and four lat washers (Figure 1, Item
4) securing two cabinet brackets (Figure 1, Item 5) to shelter loor.
Torque bolts (Figure 1, Item 2) 160-190 in. lbs.
8.
END OF WORK PACKAGE
0026 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.