• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Connecting Ceiling Lights.
Figure 5. Installing Area Light.

Operator Manual For Tool Crib Shop Part No. 1036058 & Part No. Sc4920-99-Cla69
Page Navigation
  39    40    41    42    43  44  45    46    47    48    49  
img
0007 00
TM 1-4920-441-13&P
INSTALLING CABLE AND RECEPTACLE ASSEMBLY
Figure 4.
Installing Cable and Receptacle Assembly.
1.
Release captive fasteners (Figure 4, Item 1) from receptacles (Figure 4, Item 3) on one end of shelter.
2.
Remove receptacles (Figure 4, Item 3) from transport location on hinged end wall to operating position on
hinged sidewall.
3.
Install receptacles (Figure 4, Item 3) with power cables facing up and secure captive fasteners (Figure 4,
Item 1).
4.
Secure power cable with Velcro straps (Figure 4, Item 2).
5.
Repeat Steps 1 through 4 for receptacles at other end of shelter.
0007 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.