TM 1-4920-450-13&P
2. As soon as there is enough floor area (4), the
personnel inside will move to the expanded side of the
shelter raising the roof with extended support stints
(2).
3. Once the struts (2) are totally supporting the
roof panel (1), the end walls (5) are swung to the open
position.
2-2