TM 1-4920-451-13&P
2. As soon as there is enough floor area (4), the
personnel inside will move to the expanded side of the
shelter raising the roof with extended support struts
( 2 ) .
3. Once the struts (2) are totally supporting the
roof panel (1), the end walls (5) are swung to the open
position.
2-2