TM 1-4920-451-13&P
2-6. Storage of Hardware.
Care must be taken to ensure that proper hardware is used to secure
equipment for transport. Lack of correct hardware could cause exten-
sive damage to equipment or the shelter when shop is moved.
a All hardware removed from equipment will be collected and placed in cotton mailing bags (see item 3, App
E). Bags are stored in the shop storage chest until shelter is to be moved and equipment bolted to the floor.
b. Position storage chest (1) in mounting bracket (2).
2-7. Checking Shelter Level. Once all equipment is in the recommended operational position recheck leveling of
shelter. Use procedures in TM 10-5411-201-14 to verify and adjust level. Correct adjustment is essential to ensure.
proper operation of machine tools, doors and access panels. The Rotor Shop is now operational.
SECTION Ill. PREPARING SHOP FOR SHIPMENT OR STORAGE
2-8. Recover and Inspect Equipment Hardware.
a. Remove shop storage chest from mounting brackets.
b. Recover cotton mailing bags with hardware from shop storage chest.
Care must be taken to ensure that proper hardware is used to secure
equipment for transport. Lack of correct hardware could cause exten-
sive damage to equipment or the shelter when shop is moved.
c. Inspect hardware for damage or missing parts.
2-19
