TM 10-5411-236-13&P
0006 00
CAUTION
If a bolt is lost or damaged beyond use, obtain a replacement. Do not install with less
than the proper number of bolts or damage to equipment may occur.
4. Pallet ledges are retained on the vertical rack frame by four bayonet tabs protruding into the windows
of the vertical rack frame. This requires the ledge to be loosened from the vertical rack frame. While
one person securely holds the pallet ledge, the second person applies an upward force by tapping the
underside of the ledge at the attached point with a 2 X 4 soft wooden block or similar material.
5. Place the pallet ledges in their desired positions by inserting the tabs into the vertical rack frame
windows and tapping downward with a 2 X 4 soft wooden block or similar material. Ensure that pallet
ledges in the vertical rack frame are at same height. Ensure all tabs have engaged the vertical rack
frame windows before tapping into place. Be careful to align boltholes with appropriate threaded
holes in the vertical rack frame.
NOTE
Pallets may be adjusted in 4-inch increments.
NOTE
Apply Locktite 262 Red on bolt threads of all bolts before reinstalling.
6. Reinstall the eight Allen bolts (finger tighten only).
7. Tighten all bolts using 3/16-inch hex driver socket and 3/8-inch ratchet with extension from the two
positions of each pallet ledge. Four bolts are located at each vertical rack frame.
8. Reinstall rear pallet ledge stabilizer using the four Allen bolts, finger-starting all bolts before
tightening.
9. Tighten all bolts using 3/16-inch hex driver socket and 3/8-inch ratchet with extension from the two
positions of each pallet ledge. Four bolts are located at each vertical rack frame.
10. Reinstall front pallet ledge stabilizer using the four Allen bolts, finger-starting all bolts before
tightening.
11. Tighten all bolts using 3/16-inch hex driver socket and 3/8-inch ratchet with extension from the two
positions of each pallet ledge. Four bolts are located at each vertical rack frame.
12. Reinstall pallet, ensuring cam lock is properly seated.
13. Retighten locking rod.
SECURING ASLMS CARGO USING NETS (2-foot Drawers and HAZMAT Pallets Only)
ASLMS cargo netting is attached to HAZMAT pallets and the tops of 2-inch parts drawers, and is then
tightened around the stowed material by means of adjustable straps with parachute clips.
1. Place material to be secured in the 2-inch drawer or in HAZMAT pallet.
2. Arrange net to ensure male and female parachute clips are aligned.
3. Attach the male ends of the parachute clips located on nets to the female clips located on the pallet.
4. Pull loose ends of the straps to remove slack.
5. To remove, detach parachute clips.
Change 1
0006 00-16