TM 9-4933-223-13&P
MODIFICATION
NOTE
10 "T" CONDUIT
BOX
(19).
Repair
by
Steps 1 thru 4 below are
replacement.
necessary only when the
listed parts have been
replaced with new parts or at
the time of initial installation.
1
CONDUIT BOXES J22 AND J20 (1).
a. Drill one 0.31-in. (0.79-cm) hole (2) in the bottom (3)
as illustrated.
b. Drill one 0.19-in. (0.48-cm) hole (4) in the side (5) as
illustrated.
3-99