TM 9-4933-223-13&P
(2) shelter and deploy foldout panels per TM
10-5410-224-14.
(1) Remove two straps (1) that are holding four wall shelves (2),
eight brackets (3), curtain
assemblies (4 and 5), and bag (6) to
(3) Remove ventilation fans from ceiling and
install
in
shelter
personnel door end of left table (7).
walls per TM 10-5410-22414.
(2) Remove 8 screws (8), 8 flat washers (9), 8 nuts (10), 16 flat
(4) Refer to TM 10-5410-224-14 and perform any other operations
washers (11), 16 screws (12), 3 eye bolts (13), 3 lockwashers (14), and 4
necessary for complete deployment of the shelter.
chain hooks (15) from bag (6)
(5) Store all mounting hardware in storage chest.
(3) Install each of the four wall shelvings as follows:
(a) Attach wall shelves (2) to two brackets (3) using two screws
b. Installation of Wall Shelving and Curtain Assemblies.
(8), two flat washers (9), and two nuts (10).
2-9