d. Technical Nitrogen (D) 6830-292-0131 (Figs.
machine with three 3 / 8-16 x 4-1 / 2-inch square-
1 and 2). Secure the nitrogen tank to upper block
neck carriage bolts 5306-089-1422, three 13 / 32-
inch inside diameter flat washers 5310-080-6004,
with webbing strap. Fabricate strap using webbing
three 3 / 8-inch split lock washers 5310-637-9541,
8305-263-2477 and a buckle 5340-850-8060.
Position four strap fastener loops 5340-616-4660,
and three 3 / 8-16 hexagon plain nuts 5310-761-
0654.
7-inches and 17-inches from each end of block.
Secure with eight no. 10 2-1 / 2-inch round head
h. Revolving Stool 7110-634-8596 (Figs. 1 and
3). Each stool (I) will be secured to a table with
wood screws 5305-013-0384 and eight 0.234-inch
webbing strap as shown in figure 3. Use webbing
inside diameter flat washers 5310-273-7729. Loop
8305-263-2477 and buckle 5340-850-8060, to
webbing strap through fastener loops and buckle as
fabricate webbing straps.
required to hold tank firmly in position as shown in
i. U t i l i t y G r i n d i n g M a c h i n e 3 4 1 5 - 5 1 7 - 7 7 5 4
(Figs. 1 and 3). Place the utility grinding machine
e. Nitrogen Tank
Support Block (Figs. 1, 2
and
(J) on work table (H), 7-1 / 2-inches from the right
4).
end and 2-inches from the front edge of the table
(1) Fabricate three 36-inch long support
top, as shown in figure 1. Mark and drill two
blocks (E) as shown in figure 4. Place blocks flush
11 / 32-inch holes through the table top. Secure the
with cabinet (C) on the curbside of the van as
grinding machine with two 5 / 16-18 x 3-1 / 2-inch
square-neck carriage bolts, w / sq nuts 5306-059-
(2) Place one block 35-1 / 2-inches above the
1241, two 11 / 32-inch inside diameter flat washers
floor (directly beneath angle iron). Mark and drill
5 3 1 0 - 2 6 2 - 3 0 0 3 , and two 5 / 16-inch split lock
approximately two inches from each end of block,
washers 5310-209-1191.
two 1 / 2-inch holes through block (aligned with
j. Machinist's Vise 5120-293-1439 (Figs. 1 and
holes in angle iron). Secure with two 7 / 16-20 x 5-
3). Place the machinist's vise (K) on work table
61 / 64-inch hexagon-head machine bolts 5306-
(A), 5-inches from the left end and flush with the
1 7 7 - 5 6 7 7 , two 1 / 2-inch inside diameter flat
front edge of the table top, as shown in figure 1.
washers 5310-760-2021, two 7 / 16-inch split lock
Mark and drill three 9 / 16-inch holes through the
washers 5310-905-5454, and two 7 / 16-20
table top. Secure the vise with three 1 / 2-13 x 3-
hexagon plain nuts 5310-741-5305.
1 / 2-inch square-neck carriage bolts 5306-702-
(3) Two blocks are to be positioned on the
2821, three 1 / 2-inch inside diameter flat washers
floor. Place one block flush with the wall, under
5310-809-5998, three 1 / 2-inch split lock washers
and parallel with 3.e.2 above. Place other block
5310-167-0677, and three 1 / 2-13 hexagon plain
directly in front where cut-out portion will hold
nuts 5310-021-9434.
nitrogen tank snugly between blocks. Mark and
N O T E : Four each of the above hardware
drill two inches from each end of blocks, four 1 / 2-
items are listed to meet the requirements of models
inch holes through blocks and floor of van. Secure
having four mounting holes.
each block with two 7 / 16-20 x 8-inch hexagon-
head machine bolts 5306-027-5803, two 1 / 2-inch
k. Portable Electric Drill (with stand) 5130-204-
inside diameter flat washers 5310-760-2021, two
2718 (Figs. 1 and 3). Place the portable electric
drill (with stand) (L) on work table (A) 4-inches
7 / 16-inch split lock washers 5310-905-5454, and
two 7 / 16-20 hexagon plain nuts 5310-741-5305.
from the right end and flush with the front edge of
the table top, as shown in figure 1. Mark and drill
f. Gasoline Engine Generator Set 6115-889-1446
four 7 / 16-inch holes through the table top. Secure
(Figs. 1 and 2). Place the gasoline engine generator
the drill with four 3 / 8-16 x 3-inch square-neck
set (F) on the van floor 4-1 / 2-inches from the
front wall of the van and in front of table (A) on the
carriage bolts 5306-012-6705, four 13 / 32-inch
curbside as shown in figure 1. Secure the generator
inside diameter flat washers 5310-080-6004, four
to the table legs with webbing straps. Use webbing
3 / 8-inch split lock washers 5310-637-9541, and
8305-263-2477 and buckle 5340-850-8060, to
four 3 / 8-16 hexagon plain nuts 5310-761-0654.
fabricate webbing straps.
4. Reporting of Equipment Publications
I m p r o v e m e n t s . The reporting of errors,
in the van for transportation purposes only,
omissions, and recommendations for improving this
and must be removed from the van before
publication by the individual user is encouraged.
being placed in operation.
Reports should be submitted on DA Form 2028
g. Upright Drilling Machine 3413-221-8714
(Recommended Changes to DA Publications).
(Figs. 1 and 3). Place the upright drilling machine
Forward completed forms direct to: Commanding
(G) on work table (H), 2-1 / 4-inches from the left
General, Headquarters, U . S . A r m y W e a p o n s
end and flush with the front edge of the table top, as
Command, ATTN:
AMSWE-SMM-P, Rock
shown in figure 1. Mark and drill three 7 / 16-inch
Island, IL 61201.
holes through the table top. Secure the drilling
4