• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Releasing Shelter Walls.
Figure 4. Secure Support Strut Assemblies.

Operator Manual \(Rpstl\) For Pneudraulic Shop P/N Sc4920-99-Clc64 And Part No 1036258
Page Navigation
  105    106    107    108    109  110  111    112    113    114    115  
img
TM 1-4920-433-13&P
0030 00
LOWERING SHELTER ROOF
WARNING
When all equipment and material are stored on stationary side of shelter, limited loor
space presents a safety hazard to personnel. This is most critical during raising and
lowering of roof panel. Personnel inside shelter could become trapped between roof
panel and equipment bolted to loor. Failure to observe warning could result in SERIOUS
INJURY to personnel.
A minimum of four personnel are required to perform all of the following procedures.
CAUTION
When swinging end wall closed, D-rings on ECU panel should be pressed lat against panel to
prevent damage to hinged roof.
Figure 3.
Lowering Shelter Roof.
1.
Two personnel inside shelter, using support strut assemblies (Figure 3, Item 2), will lower roof panel (Figure
3, Item 1) until two personnel outside can reach and hold weight of roof panel .
0030 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.