• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Test Ground Rod.
ILLUSTRATED LIST OF MANUFACTURED ITEMS

Field Maintenance Manual For Sheet Metal Shop Part No. 1035658 And Part No. Sc4920-99-A68
Page Navigation
  257    258    259    260    261  262  263    264    265    266    267  
img
TM 1-4920-435-13&P
0067 00
INSTALLATION
1.
Remove nut (Figure 3, Item 2), lock washer (Figure 3, Item 3), and lat washer (Figure 3, Item 4) from ground
stud (Figure 3, Item 7) on power entry panel (Figure 3, Item 1).
2.
Connect ground cable lug (Figure 3, Item 5) to ground stud (Figure 3, Item 7).
3.
Secure with lat washer (Figure 3, Item 4), lock washer (Figure 3, Item 3), and nut (Figure 3, Item 2).
4.
Ensure all connections are secure.
END OF WORK PACKAGE
0067 00-3/4 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.