• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PREPARING SHELTER FOR ECU STOWAGE
Figure 4. Installing Plugs on ECU Fold-down Panel.

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  104    105    106    107    108  109  110    111    112    113    114  
img
0031 00
TM 1-4920-438-13&P
CLOSING ECU FOLD-DOWN PANELS - CONTINUED
Figure 2.
Closing ECU Fold-down Panel.
3.
Lift outside seal (Figure 2, Item 2) and close ECU (B) fold-down panel (Figure 2, Item 1).
Figure 3.
Securing ECU Fold-down Panel Latches.
4.
Turn latches (Figure 3, Item 3) clockwise, to hold ECU (B) fold-down panel (Figure 3, Item 1) in place, and
secure latch bolts (Figure 3, Item 2).
0031 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.