• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 5. Secure ECU (A).
PREPARING SHELTER FOR ECU STOWAGE

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  102    103    104    105    106  107  108    109    110    111    112  
img
. . . . . . .
TM 1-4920-438-13&P
0030 00
OPERATOR INSTRUCTIONS
POWER TRAIN SHOP
POSITIONING SHELTER BII BOX FOR TRANSPORT MODE
INITIAL SETUP:
References
Tools and Special Tools
WP 0002 00
General Mechanics Tool Kit
(WP 0067 00, Table 2, Item 104 )
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
POSITIONING SHELTER BII BOX FOR TRANSPORT MODE
Figure 1.
Secure Shelter BII Box.
1.
Remove one setscrew from shelter BII box transport location loor insert and store in shelter BII box
(WP 0002 00, Figure 2, Item 8 or WP 0002 00, Figure 3, Item 8).
2.
Remove one cargo strap (Figure 1, Item 2) from secure storage location and one ring bolt (Figure 1, Item 1)
from shelter BII box (WP 0002 00, Figure 2, Item 8 or WP 0002 00, Figure 3, Item 8).
3.
Install one ring bolt (Figure 1, Item 1) into loor insert at transport location.
4.
Secure shelter BII box with cargo strap (Figure 1, Item 2) and two ring bolts (Figure 1, Item 1).
END OF WORK PACKAGE
0030 00-1/2 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.