0050 00
TM 1-4920-438-13&P
REMOVAL
Remove two bolts (Figure 1, Item 2), two lock washers (Figure 1, Item 5), two upper lat washers (Figure 1, Item
3), two lower lat washers (Figure 1, Item 4) and two nuts (Figure 1, Item 6).
INSTALLATION
Replace upright drilling machine (Figure 1, Item 1) by installing two bolts (Figure 1, Item 2), two lock washers
(Figure 1, Item 5), two upper lat washers (Figure 1, Item 3), two lower lat washers (Figure 1, Item 4) and two
nuts (Figure 1, Item 6).
END OF WORK PACKAGE
0050 00-2