Figure 11. Solar Bar Handles.
Figure 13. Positioning Roof and Hinged End Walls.

Maintenance Manual For Production/ Quality Control Shop Part No. 1036659 And Part No. Sc4920-99-Cla66
Page Navigation
  24    25    26    27    28  29  30    31    32    33    34  
img
0005 00
TM 1-4920-440-13&P
POSITIONING ROOF AND HINGED END WALLS CONTINUED
WARNING
When all equipment and material are stored on stationary side of shelter, limited loor
space presents a safety hazard to personnel. This is most critical during raising and
lowering of roof panel. Personnel inside shelter could become trapped between roof
panel and equipment bolted to loor. Failure to observe warning could result in SERIOUS
INJURY to personnel.
A minimum of four personnel are required to perform all of the following procedures.
Figure 12.
Raising Hinged Roof.
NOTE
Two personnel outside shelter must lift roof panel far enough to allow two people inside to
perform following steps.
2.
Lift roof panel (Figure 12, Item 1).
3.
Release two support strut assemblies (Figure 12, Item 3) from roof panel and extend them to full length.
4.
Insert pin (Figure 12, Item 2).
0005 00-12