• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CONNECTING WATER SUPPLY
DISCONNECTING COMPRESSED AIR AND WATER

Maintenance Manual For Production/ Quality Control Shop Part No. 1036659 And Part No. Sc4920-99-Cla66
Page Navigation
  79    80    81    82    83  84  85    86    87    88    89  
img
. . .
TM 1-4920-440-13&P
0020 00
OPERATOR INSTRUCTIONS
PRODUCTION/QUALITY CONTROL SHOP
CHECKING SHELTER LEVEL
INITIAL SETUP:
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
References
WP 0005 00
CHECKING SHELTER LEVEL
After all equipment has been placed in the suggested operational position, recheck leveling of shelter. See
WP 0005 00, Siting Requirements, to verify and adjust shelter level. Correct leveling adjustments are essential
to ensure proper operation of equipment, tools, doors, and access panels.
The shop is now operational.
END OF WORK PACKAGE
0020 00-1/2 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.