• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Oil/Water Separator Controls and Indicators.
Figure 1. Leveling Support Jack Assemblies.

Operator Manual For Tool Crib Shop Part No. 1036058 & Part No. Sc4920-99-Cla69
Page Navigation
  14    15    16    17    18  19  20    21    22    23    24  
img
. . . .
TM 1-4920-441-13&P
0005 00
OPERATOR INSTRUCTIONS
TOOL CRIB SHOP
OPERATION UNDER USUAL CONDITIONS: SITING REQUIREMENTS
INITIAL SETUP:
References
Tools and Special Tools
WP 0002 00
General Mechanics Tool Kit
WP 0033 00
(WP 0059 00, Table 2, Item 104 )
Equipment Condition
Personnel Required
Functional
CMF 15 Series (4)
SECURITY MEASURES FOR ELECTRONIC DATA
NA
SITING
The Tool Crib Shop should be set up with power cable length, tactical deployment, exhaust/inlet of ECUs, and
phasing between related shops kept in mind. The shop s power entry panel, next to personnel entrance door,
should be facing toward the power source and power distribution box (PDB).
0005 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.