• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POSITIONING CABLE REEL ASSEMBLIES FOR TRANSPORT MODE
PREPARING SHELTER FOR ECU STOWAGE

Operator Manual For Tool Crib Shop Part No. 1036058 & Part No. Sc4920-99-Cla69
Page Navigation
  97    98    99    100    101  102  103    104    105    106    107  
img
.
0028 00
TM 1-4920-441-13&P
POSITIONING CABLE REEL ASSEMBLIES FOR TRANSPORT MODE - CONTINUED
1.
Remove four setscrews from loor inserts at cable reel assemblies (Figure 1, Item 1) transport locations.
2.
Store setscrews (WP 0064 00, Figure 2, Item 18 and 19) in shelter BII box.
3.
Remove two cargo straps (Figure 1, Item 4) from secure storage location and four ring bolts (Figure 1, Item
3) from shelter BII box.
4.
Insert ring bolts (Figure 1, Item 3) into loor inserts at transport location.
5.
Position cable assemblies (Figure 1, Item 1 and 2) at transport location.
6.
Secure cable reel assemblies (Figure 1, Item 1 and 2) to ring bolts (Figure 1, Item 3) with cargo strap (Figure
1, Item 4).
END OF WORK PACKAGE
0028 00-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.