TM 1-4920-441-13&P
OPERATOR INSTRUCTIONS
TOOL CRIB SHOP
PREPARING SHELTER FOR ECU STOWAGE
INITIAL SETUP:
References
Tools and Special Tools
General Mechanics Tool Kit
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
NOTE
Skip this Work Package if ECUs are not installed
CLOSING ECU FOLD-DOWN PANELS
Figure 1.
Removing T-Seal.
1.
Remove T-seal (Figure 1, Item 1) from gap located between ECU (B) fold-down panel (Figure 1, Item 2) and
ECU (B) security screen at cargo end of shelter.
2.
Store T-seal (Figure 1, Item 1) in shelter BII box.
0029 00-1