0032 00
TM 1-4920-441-13&P
RAISING HINGED FLOOR - CONTINUED
Figure 9.
Load Balancers Slide Stops, Lower Position.
7.
Remove lockout pins (Figure 9, Item 4) from upper position on both load balancers (Figure 9, Item 3).
8.
Close slide stops (Figure 9, Item 1) against support cables (Figure 9, Item 2) on load balancers (Figure 9,
Item 3).
9.
Replace lockout pins (Figure 9, Item 4) in lower position on load balancers (Figure 9, Item 3).
0032 00-8