TM 1-4920-500-13&P
0001 00
PREPARATION FOR STORAGE OR SHIPMENT
NOTE
Refer to TM 10-5411-201-14, Operator, Organizational, Direct Support, and
General Support Maintenance for Shelter, Tactical, Expandable, One-Sided, if
necessary.
1. Refer to shop equipment TMs and manufacturer supplied operating manuals for proper storage and shipment
instructions.
2. Inspect the shelter for the following and ensure that:
b. Circuit breaker panel door is secured.
c.
Lights and receptacle outlets are properly stowed.
d. Jacks are secured in the appropriate stowage position.
e. Roof struts are secured.
f.
Stop plate in the load balancer is in down position and secured with pin.
g. Foot bolt and chain bolt are secured.
h. Camlock pin is engaged in hole on corner post.
i.
All shelter components are properly secured.
j.
Protective dust caps are secure on power entry panel receptacles and binding posts are tightened.
k.
All doors are secured.
3. Store shelter in a dry area or a designated supply facility. If stored outside in humid conditions, perform a
quarterly inspection to ensure moisture is not inside shelter.
WARRANTY INFORMATION
For warranty information, please e-mail inquiries to: https://pmskot.army.mil/SKO_Warranty.html.