• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 47 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 49 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  27    28    29    30    31  32  33    34    35    36    37  
img
TM 1-4920-500-13&P
0005 00
WARNINGS
When all equipment and materiel is stored on stationary side of shelter,
limited floor space presents a safety hazard to personnel. This is most
critical during raising and lowering of roof panel. Personnel inside shelter
could become trapped between roof panel and equipment bolted to floor.
Failure to observe warning could result in SERIOUS INJURY to
personnel.
A minimum of four personnel are required to perform all of the following
procedures.
2
4
3
SSAE016
NOTE
Two personnel outside shelter must lift roof panel far enough to allow two people
inside to perform following steps.
2. Lift roof panel (2).
3. Release two support struts (3) from roof panel (2) and extend them to full length.
4. Insert lock pin (4).
0005 00-12


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.