• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 42 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 44 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  22    23    24    25    26  27  28    29    30    31    32  
img
. .
TM 1-4920-500-13&P
0005 00
POSITIONING HINGED SIDEWALL
SSAE010
1. Obtain two sidewall support braces from shelter BII box. (See WP 0002, Figure 2, Item 12).
2. Raise hinged sidewall and hold in position.
2
1
3
2
SSAE011
3. Install two sidewall support braces (1) in brace cups marked "A" (2) on hinged floor and sidewall behind
support cable (3).
0005 00-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.