• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 38 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 40 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  18    19    20    21    22  23  24    25    26    27    28  
img
TM 1-4920-500-13&P
0005 00
NOTE
Stencil on ISO jack assemblies indicate handle rotation to raise or lower jack.
8
9
4
6
2
5
7
3
SSAE006
3. Ensure ISO jack assemblies (2) are lowered completely.
4. Place upper jack attachment insert (9) on upper jack support bracket (8) on corner post.
5. Insert jack attachment (3) into lower ISO fitting (7) of shelter.
6. Turn locking handle (5) to rotate jack attachment (3) on ISO jack assembly (2) to lock.
7. Rotate handle (6) counter clockwise on ISO jack assembly (2) to raise until safety pin (4) can be installed.
8. Install safety pin (4).
9. Repeat steps 3 through 8 at three remaining corners.
CAUTION
ISO jack assemblies must be raised simultaneously to prevent excessive strain
on ISO jack assemblies or shelter. Shelter must be raised a minimum of 3 inches
(7.6 cm) off ground.
10. Simultaneously raise ISO jack assemblies (2) at each corner of shelter.
0005 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.