TM 1-4920-500-13&P
ARMAMENT AND ELECTRICAL SHOP
OPERATION UNDER USUAL CONDITIONS
SITING REQUIREMENTS
The Armament and Electrical Shop should be set up with power cable length, tactical deployment, exhaust/inlet of
ECUs, and phasing between related shops kept in mind. The shop's power entry panel, next to personnel
entrance door (see WP 0002, Figure 1), should be facing toward the power source and power distribution box
(PDB).
ASSEMBLY AND PREPARATION FOR USE
NOTES
Each shelter is equipped with six container jacks. Four ISO jack assemblies
are used on fixed side to lift and level shelter and two hinged jack assemblies
are used on expanded side to level hinged floor after expansion.
Refer to WP 0016 for unusual ground conditions.