TM 1-4920-500-13&P
0005 00
1. Obtain level from shelter basic issue items (BII) box. (See WP 0002, Figure 2, Item 12).
2. Level both cargo and personnel end (See WP 0002, Figure 1) from side to side, and middle of shelter from
end to end by adjusting ISO jack assemblies accordingly.
SHELTER EXPANSION
2
1
3
2
1
3
4
4
SSAE007
1. Remove lockout pins (4) from lower position on both load balancers (3).
2. Open slide stops (1) against support cables (2) on both load balancers (3).
3. Install lockout pins (4) in upper position on both load balancers (3).