• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 86 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 88 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  66    67    68    69    70  71  72    73    74    75    76  
img
TM 1-4920-500-13&P
0008 00
5
4
3
2
SSAE059
3. Obtain two bolts (3), two lock washers (4), and two flat washers (5) from cotton mailing bag located in shelter
BII box.
4. Obtain eyewash station wall bracket (2) from inside eyewash station.
5. On expanded wall, align insert holes with eyewash station wall bracket (2).
6. Install two bolts (3), two lock washers (4), and two flat washers (5).
7. Torque bolts 160-190 in. lbs.
2
SSAE060
8. Obtain eyewash station (1) and install on eyewash station wall bracket (2).
0008 00-19


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.