TM 1-4920-500-13&P
0016 00
NOTE
A minimum of a quarter turn is required to obtain maximum holding power.
Pull Up To Secure
SSAE120
5. Insert driving rod through loop and pull up sharply to ensure anchor is set into ground.
NOTE
When moving shelter, disassemble storm configuration kit and cut cable as close
to ground as possible. Discard cable components. Retain the two tie-down rings
and store in shelter BII box.
Tiedown
Ring
Cable
Cable
Clamp
2 Places
4 Places
SSAE121
6. Remove clamp, loop cable at six places (two with tie-down rings) as shown.
7. Replace clamp and tighten clamp nuts.
0016 00-5