• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 148 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 150 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
img
TM 1-4920-500-13&P
0016 00
NOTE
A minimum of a quarter turn is required to obtain maximum holding power.
Pull Up To Secure
SSAE120
5. Insert driving rod through loop and pull up sharply to ensure anchor is set into ground.
NOTE
When moving shelter, disassemble storm configuration kit and cut cable as close
to ground as possible. Discard cable components. Retain the two tie-down rings
and store in shelter BII box.
Tiedown
Ring
Cable
Cable
Clamp
2 Places
4 Places
SSAE121
6. Remove clamp, loop cable at six places (two with tie-down rings) as shown.
7. Replace clamp and tighten clamp nuts.
0016 00-5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.