TM 1-4920-500-13&P
0016 00
OPERATION IN HIGH WINDS
WARNING
To avoid injury when expanding or closing hinged sidewall in high winds, use six
personnel.
NOTE
Two personnel are required to perform the following procedure.
Driving Head
Holding Handle
Driving
Rod
Ground
Anchor
Tiedown
Assembly
Ring
SSAE117
1. To install storm configuration (tie-down installation) kit, use the following items:
a. Ground anchor assembly
b. Driving rod
c.
Holding handle
d. Driving head
e. Tie-down ring