• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
'Microsoft Word - WP1' by ginda.roadruck - Page 142 of 338
'Microsoft Word - WP1' by ginda.roadruck - Page 144 of 338

Operator And Field Maintenance For Armament And Electrical Shop P/N 1024506
Page Navigation
  122    123    124    125    126  127  128    129    130    131    132  
img
.
TM 1-4920-500-13&P
0015 00
LOWERING SHELTER
NOTES
If it is intended to use a dolly set to move shelter, place pieces of 4x4 lumber
under frame. Ensure that ISO fittings are clear to facilitate mounting of dolly
set.
Stencil on ISO jack assemblies indicate handle rotation to raise or lower jack.
2
1
6
5
7
3
4
SSAE115
1. Remove safety pins (6) from ISO jack assemblies (5).
2. Lower all ISO jack assemblies (5) simultaneously until shelter is completely lowered.
3. Turn locking handle (7) clockwise thus unlocking jack attachment (4) from ISO fitting (3).
4. Remove upper jack attachment insert (1) from upper jack support bracket (2).
5. Remove ISO jack assemblies (5) from four corners of shelter.
0015 00-11


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.