TM 1-4920-500-13&P
ARMAMENT AND ELECTRICAL SHOP
SERVICE UPON RECEIPT OF MATERIEL
INITIAL SETUP
Tools And Special Tools:
References:
General Mechanics Tool Kit
TM 5-4120-369-14
TM 10-5411-201-14
Personnel Required: (1)
CMF 15 Series
Explosion Proof, Dust Ifnition Proof Industrial
Vaccum Cleaner System
Pure Flow 1000
Arm-EVAC 50
Jet Arbor Press
1. Perform an inventory on shelter contents.
2. Inspect cabinet assemblies and work table top assemblies to ensure that mounting hardware is firmly secured
to floor, wall, cabinet and cabinet brackets (see WP 0019 00, 0021 00, 0038 00).
3. Inspect all equipment that is installed to counter tops, wall mounts, and floor mounts to ensure that all items
are firmly secured (see WPs 0020 00, 0022 00 through 0027 00, 0037 00, and 0038 00).
4. Preventive Maintenance (PM) and preoperational services will be performed IAW applicable shelter
equipment TM's or manufacturer-supplied operating manuals.
a. TMs:
(1) TM 5-4120-369-14, Air Conditioner Horizontal Compact
(2) TM 10-5411-201-14, Operator, Organizational, Direct Support, and General Support Maintenance for
Shelter, Tactical, Expandable, One-Sided
b. COTS:
(2) Explosion Proof, Dust Ignition Proof Industrial
(3) Vaccum Cleaner System
(4) Pure Flow 1000
(5) Arm-EVAC 50
(6) Jet Arbor Press
End of Work Package
0018 00-1/(0018 00-2 blank)