TM 9-4933-223-13&P
2-5. PREPARATION FOR MOVEMENT (cont)
(3) Place wall shelves (1), brackets (2), and mounting hardware at
(5) Fold end curtain assembly (9) and side curtain assembly (10)
personnel door end of left table (8).
and place on top of wall shelves (1) on left table (8).
(4) Unhook end curtain assembly (9) and side curtain assembly
(6) Remove four chain hooks (11) hanging from three eyebolts (13)
(10) from four chain hooks (11) hanging from the ceiling near ventilation fan
in ceiling.
(12) at cargo door end of shop set.
2-30