3-8.
ELECTRICAL POWER TEST SETS.
The five test sets are mounted on the front of the
a. General.
trailer.
b.
(1) Unscrew the two chain and bolt assemblies (8) on four
power test sets (5).
(2) Remove two screws and a retainer plate from the rear of
each test set.
(3) Using a suitable lifting device, slide power test set (5)
from frame mounts and off the trailer.
(4) Remove eight nuts, eight washers, eight screws and remove
60 KW power test set.
c. Installation. Install the five electrical power test sets (5)
in reverse order of removal, b. above.
Electrical Power Test Sets.