TM 9-4940-549-14&P
Section III. MOVEMENT TO A NEW WORKSITE
DISMANTLING FOR MOVEMENT.
Disconnect the external power source, if used.
a.
Dismantle the canvas tenting (figs. 4-6, 4-7, and 4-8).
b.
Disconnect welding cables and stow in the proper compartments.
c.
d.
Secure all portable equipments and stow in proper place and latch
and/or lock all drawers.
NOTE
e.
f.
Remove the ground rod.
If the shop set is to be moved by rail, reverse the procedure de-
g.
4-11.
the shop set.
Section IV. LUBRICATION
GENERAL LUBRICATION INFORMATION..
This section contains lubrication instructions.
a.
b.
Care of Lubricants. Store all lubricants in closed containers and
keep them in a clean dry area, away from heat. Keep all lubrication
equipment clean and ready for use.
c.
Cleaning.
(1) Wipe area around the points of lubrication before and after ap-
plying lubricant. Remove excess lubricant after lubrication.
(2) Always keep shop set free of spilled lubricant.
Operation After Lubrication. After each engine oil change, start the
d.
engine and check the oil pressure. If oil pressure is not indicated
within 30 seconds, stop the engine and check the oil level. Add oil
if necessary. Inspect the oil filter, oil lines , and connections for
leaks.