0053 00
TM 1-4920-440-13&P
INSTALLATION CONTINUED
Figure 5.
Water Feed-thru Connector Assembly.
2.
Install water feed-thru connector assembly (Figure 5, Item 1) from outside of shelter with long end through
hole.
Figure 6.
Water Feed-thru Connector Assembly.
3.
Install all but one screw (Figure 6, Item 2), and have an assistant install two lat washers (Figure 6, Item 3),
two lock washers (Figure 6, Item 4), and two nuts (Figure 6, Item 5) inside shelter and secure.
4.
Replace one lanyard (Figure 6, Item 6) on outside of shelter and install remaining screw (Figure 6, Item 2).
5.
Have an assistant install lat washer (Figure 6, Item 3), lock washer (Figure 6, Item 4), second lanyard (Figure
6, Item 6), and nut (Figure 6, Item 5) on inside of shelter.
6.
Tighten screws (Figure 6, Item 2).
0053 00-4