• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Connecting Main Power Cable to PDB.
Figure 2. Installing Ceiling Lights.

Operator Manual \(Rpstl\) For Pneudraulic Shop P/N Sc4920-99-Clc64 And Part No 1036258
Page Navigation
  35    36    37    38    39  40  41    42    43    44    45  
img
. .
TM 1-4920-433-13&P
0007 00
OPERATOR INSTRUCTIONS
PNEUDRAULIC SHOP
INSTALL LIGHTING
INITIAL SETUP:
Personnel Required
Tools and Special Tools
General Mechanics Tool Kit
CMF 15 Series (2)
(WP 0062 00, Table 2, Item 104 )
Equipment Condition
Functional
INSTALLING CEILING LIGHTS
WARNING
Inhalation of phosphorous dust could cause SERIOUS INJURY to personnel. In an event of
lamp breakage, care must be taken in removal of broken glass fragments and white phospho-
rous dust that may be dispersed within ixture.
Figure 1.
Main Circuit Breaker.
1.
Set main circuit breaker and all other circuit breakers in breaker panel to the OFF position.
0007 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.