0034 00
TM 1-4920-436-13&P
INSTALLATION CONTINUED
CONTINUED
e.
On non-inished side of work surface (Figure 5, Item 5) at eight marked hole placements, center punch
and drill eight 5/16 inch holes to a depth of 3/4 inch.
f.
Return work surface (Figure 5, Item 5) inished side up, on top of shelf cabinet (D) (Figure 5, Item 6).
3.
Align bolt holes in work surface (Figure 5, Item 5) with bolt holes on top of shelf cabinet (D) (Figure 5, Item 6).
4.
Install lag eight bolts (Figure 5, Item 1), eight lock washers (Figure 5, Item 2), six large lat washers (Figure 5,
Item 3), and two small lat washers (Figure 5, Item 4) securing work surface (Figure 5, Item 5) to shelf cabinet
(D) (Figure 5, Item 6).
5.
Install four bolts (Figure 5, Item 8), eight lat washers (Figure 5, Item 4), four lock washers (Figure 5, Item 2),
and four nuts (Figure 5, Item 9) securing two cabinet brackets (Figure 5, Item 7) into shelf cabinet (D) (Figure
5, Item 6).
NOTE
Steps 6 and 7 are only for the SC4920-99-CLA60 coniguration which contains a grinding
machine. Skip to step 8 if working in the 1035258 coniguration.
6.
If new cabinet (D) (Figure 5, Item 6 must be installed:
a.
Use holes (Figure 5, Item 14 and 15) of existing work surface (Figure 5, Item 5) to determine drill bit
sizes.
b.
Match drill holes of work surface (Figure 5, Item 5) through cabinet (D) (Figure 5, Item 6).
7.
If a new work surface (Figure 5, Item 5) must be installed:
a.
Position right side of grinding machine 31.50 inches from right side of work surface (Figure 5, Item 5) and
bolt holes of grinding machine 4.50 inches from front of work surface (Figure 5, Item 5). Mark placement
holes (Figure 5, Item 14 and 15). Set aside grinding machine.
b.
Center punch and drill two 1/2 inch holes through work surface (Figure 5, Item 5) and shelf cabinet (D)
(Figure 5, Item 6).
8.
Install hardware attaching shelf cabinet (D) (Figure 5, Item 6) to shelter loor IAW WP 0035 00, Cabinets C
and D Hardware, INSTALLATION.
9.
Install drawers, slides, and shelves as necessary (Drawers, Slides, And Shelves, INSTALLATION).
10. Install kick plate (Kick Plate, INSTALLATION).
0034 00-12