TM 1-4920-436-13&P
0034 00
INSTALLATION CONTINUED
b.
Match drill holes of work surface (Figure 6, Item 16) through four drawer cabinet (E) (Figure 6, Item 6)
and four drawer cabinet (F) (Figure 6, Item 7).
7.
If a new work surface (Figure 6, Item 16) has been installed and/or new four drawer cabinet (E) (Figure 6,
Item 6) and /or four drawer cabinet (F) (Figure 6, Item 7) must be installed:
a.
Position front right corner of hand pump 3.50 inches from left side of work surface (Figure 6, Item 16) and
1.50 inches from front of work surface (Figure 6, Item 16). Mark four placement holes (Figure 6, Item 8,
9, 10, and 11). Set aside hand pump.
b.
Position front left corner of 10 ton press 11.00 inches from left side of work surface (Figure 6, Item 16)
and 6.00 inches from front of work surface (Figure 6, Item 16). Mark four placement holes (Figure 6,
Item 12, 13, 14, and 15). Set aside 10 ton press.
c.
Center punch and drill four 1/4 inch holes (Figure 6, Item 8, 9, 10, and 11) through work surface (Figure
6, Item 16) and four drawer cabinet (F) (Figure 6, Item 7).
d.
Center punch and drill four 1/2 inch holes (Figure 6, Item 12, 13, 14, and 15) through work surface
(Figure 6, Item 16) and four drawer cabinet (E) (Figure 6, Item 6) and four drawer cabinet (F) (Figure 6,
Item 7).
8.
Install hardware attaching four drawer cabinet (E) (Figure 6, Item 6) and four drawer cabinet (F) (Figure 6,
Item 7) to shelter loor IAW WP 0035 00, Cabinet E and F Hardware, INSTALLATION.
9.
Install drawers, slides, and shelves as necessary (Drawers, Slides, And Shelves, INSTALLATION).
10. Install kick plate (Kick Plate, INSTALLATION).
END OF WORK PACKAGE
0034 00-15/16 blank