• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 1. Oil/Water Separator Controls and Indicators.
Figure 1. Leveling Support Jack.

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  13    14    15    16    17  18  19    20    21    22    23  
img
. . . .
TM 1-4920-438-13&P
0005 00
OPERATOR INSTRUCTIONS
POWER TRAIN SHOP
OPERATION UNDER USUAL CONDITIONS: SITING REQUIREMENTS
INITIAL SETUP:
References
Tools and Special Tools
WP 0002 00
General Mechanics Tool Kit
WP 0035 00
(WP 0067 00, Table 2, Item 104 )
Equipment Condition
Personnel Required
Functional
CMF 15 Series (4)
SECURITY MEASURES FOR ELECTRONIC DATA
NA
SITING
The Power Train Shop should be set up with power cable length, tactical deployment, exhaust/inlet of ECUs,
and phasing between related shops kept in mind. The shop s power entry panel, next to personnel entrance
door, should be facing toward the power source and power distribution box (PDB).
0005 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.