TM 1-4920-438-13&P
OPERATOR INSTRUCTIONS
POWER TRAIN SHOP
OPERATION UNDER USUAL CONDITIONS: SITING REQUIREMENTS
INITIAL SETUP:
References
Tools and Special Tools
General Mechanics Tool Kit
Equipment Condition
Personnel Required
Functional
CMF 15 Series (4)
SECURITY MEASURES FOR ELECTRONIC DATA
NA
SITING
The Power Train Shop should be set up with power cable length, tactical deployment, exhaust/inlet of ECUs,
and phasing between related shops kept in mind. The shop s power entry panel, next to personnel entrance
door, should be facing toward the power source and power distribution box (PDB).
0005 00-1