• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SECURING THE SHELTER
Figure 2. Installing Ground Anchors.

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
img
. . .
TM 1-4920-438-13&P
0035 00
OPERATOR INSTRUCTIONS
POWER TRAIN SHOP
OPERATION UNDER UNUSUAL CONDITIONS
INITIAL SETUP:
References
Tools and Special Tools
General Mechanics Tool Kit
WP 0002 00
(WP 0067 00, Table 2, Item 104 )
Equipment Condition
Personnel Required
Functional
CMF 15 Series (6)
UNUSUAL ENVIRONMENT/WEATHER
OPERATION IN HIGH WINDS
WARNING
To avoid INJURY when expanding or closing hinged sidewall in high winds, use six personnel.
Figure 1.
Storm Coniguration Kit.
0035 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.