• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 3. Loops and Clamps Installation.
OPERATION DURING BLACKOUT CONDITIONS

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  131    132    133    134    135  136  137    138    139    140    141  
img
. .
0035 00
TM 1-4920-438-13&P
UNUSUAL ENVIRONMENT/WEATHER CONTINUED
OPERATION IN HIGH WINDS CONTINUED
NOTE
A minimum of a quarter turn is required to achieve maximum holding power.
Figure 4.
Securing Loops and Clamps.
5.
Insert driving rod through loop and pull up sharply to ensure anchor is set into ground.
NOTE
When moving shelter, disassemble storm coniguration kit and cut cable as close to ground as
possible. Discard cable components. Retain the two tie-down rings and store in shelter BII box
(WP 0002 00, Figure 2, Item 4 or WP 0002 00, Figure 3, Item 4).
Figure 5.
Attaching Loops and Clamps.
6.
Remove clamp, loop cable at six places (two with tie-down rings) as shown.
7.
Replace clamp and tighten clamp nuts.
0035 00-4


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.