• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 2. Installing Ground Anchors.
Figure 4. Securing Loops and Clamps.

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  130    131    132    133    134  135  136    137    138    139    140  
img
TM 1-4920-438-13&P
0035 00
UNUSUAL ENVIRONMENT/WEATHER CONTINUED
OPERATION IN HIGH WINDS CONTINUED
Figure 3.
Loops and Clamps Installation.
3.
Drive each of six loop and clamp ground anchors into ground approximately 3 feet (91.5 cm) deep, and as
close as possible to shelter attaching points, at locations indicated.
4.
Set each ground anchor by forming a loop in cable end and secure loop with clamp.
0035 00-3


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.