• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 7. Connecting Main Power Cable to PDB.
Figure 2. Installing Ceiling Lights.

Aviation Maintenance Manual For Power Train Shop P/N 1036459 And P/N Sc492097Cla65
Page Navigation
  35    36    37    38    39  40  41    42    43    44    45  
img
. . .
TM 1-4920-438-13&P
0007 00
OPERATOR INSTRUCTIONS
POWER TRAIN SHOP
INSTALL LIGHTING
INITIAL SETUP:
References
Tools and Special Tools
General Mechanics Tool Kit
WP 0002 00
(WP 0067 00, Table 2, Item 104 )
Equipment Condition
Personnel Required
Functional
CMF 15 Series (2)
INSTALLING CEILING LIGHTS
WARNING
Inhalation of phosphorous dust could cause SERIOUS INJURY to personnel. In an event of
lamp breakage, care must be taken in removal of broken glass fragments and white phospho-
rous dust that may be dispersed within ixture.
Figure 1.
Main Circuit Breaker.
1.
Set main circuit breaker and all other circuit breakers in breaker panel to the OFF position.
0007 00-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.